Latest projects

Price Chopper | Hamilton, NY

Brand new build from the ground up.

Heritage Health Care - Utica, NY

Replaced Heritage's old 100-ton compressor after it was struck by lightning.

Lord & Taylor - Albany, NY

Crossgates Mall | 55,000 Sq. foot renovation and installed a 465-ton TRANE rooftop units.

DSW - Poughkeepsie, NY

Complete remodel of 15,000 sq. foot DSW Galleria, our in-house sheet metal fabrication shop custom made the new curb adapters in order for new units to fit existing roof curbs.

Utica College - Utica, NY

Organic Chemistry Lab | Complete remodel of their state of the art chemistry lab with a specialty HAKON unit.

Turning Stone Casino and Resort - Verona, NY

Removal of 2000-tons of antiquated cooling system to make way for their new system.

First Methodist Church - New Hartford, NY

TRANE heating and air conditioning rooftop unit with a duct network consisting of double wall spiral pipe, one sound attenuator, and approximately 100 ft duct sock.

Carmen Marsalas (Residental) - Utica, NY

Replacement of residential boiler in home basement.

Steet Toyota - Yorkville, NY

Cpnstruction renovations and additions to the Street Toyota building.

CP Building - Utica, NY

Replacement of 425 ton rooftop units previously done in 1986.

Oneida County Health Dept - Rome, NY

Complete renovation of old Herb Philipson's units to new 10 rooftop units.

Northeast Air Defense - Rome, NY

Installed underground refrigerant piping for new air conditioning.